Woodglen Water Treatment Plant (D&C)

This project required the design and construction of a 20 ML/day DAFF water treatment plant on a greenfield site. To deliver the project CCB Envico partnered with Laurie Curran Water who acted as the process designer and mechanical installation contractor. The project involved construction of reinforced concrete DAFF filters, above and below ground interconnecting pipe work, sludge handling systems, and chemical dosing systems for caustic and ACH and fluoride. This plant successfully passed proof of performance testing and was handed over in late 2010.

 

 

Client: 

East Gippsland Water

 

Client contact details: 
Name: Chris Cook
Telephone: 0409 356 777
Facsimile: 
Email: 

Consultants: 

Laurie Curran Water – Process Mechanical detailed, designed & Supply

 

CCB Envico project staff: 
Project Manager:
Site Manager: 
Representative:
Administrator:  
Average Workforce: 20

 

Contact details: 
Name: Laurie Curran
Telephone: 03 5255 4210
Facsimile: 
Email:

 

Project duration: 18 months from 2009 - 2010