1 Wallan STP 776x384-1481-776-384-80-c

Wallan Wastewater
Treatment Plant Major Upgrade

DHA plumbing, stormwater and electrical

supply upgrade and renewal

Weno WTP Chuuk 776x384 1-1458-776-384-80-c

Weno Wastewater Treatment Plant, Chuuk, FSM 
A design and construct project involving the rehabilitation

of a conventional

2 Dubbo WTP 776x384 1550-1431-776-384-80-c

Dubbo STP Major Upgrade
A Cockram Envico partnership project. Upgrade

works includes the provision

HMAS COVER

Civil Works at HMAS Cerberus
A DHA
DHA plumbing, stormwater and electrical supply

upgrade and renewal.

Pohnpei STP Augmentation
Pohnpei Utilities Corporation
Upgrade and expansion of a sewage treatment plant
Pohnpei Pipeline 776x384 5-1478-776-384-80-c
Pohnpei STP Pipeline, FSM
This project is a variation to already completed works by CCB Envico
for the Pohnpei STP for the Asian Development Bank
1 COVER
Goondiwindi WWTP
Goondiwindi Shire Council
1ml/day Sewage treatment plant upgrade including stainless steel
Mt Martha Mechanical
Transfield South East Water Alliance
Instalment of 5 Pall ultra-filtration skids
Black Rock STP Building and Civil works
John Holland / Barwon Water
Construction of all Civil and Building Works
 
Mulwala Waste Water Treatment Plant
Corowa Shire Council 
Replacement of a trickling filter waste water treatment plant
Janefield Sewerage Flow Control Facility
Yarra Valley Water
Construction of the $8 million Janefield Sewerage Flow Control Facility
Apollo Bay Flow Equalisation Tank
Barwon Region Water Corporation
Construction of a large water retaining structure. 
Bendigo Sludge Handling Facility
Coliban Water
Augmentation of an existing sluge handling building
Bendigo Inlet Facility
Coliban Water
Refurbishment of an existing sewage inlet structure including installation of 3 new drum screens
shoalhaven WWTP Add07-439-370-316-80-c
Shoalhaven Heads WTP Upgrade

This project involved a significant upgrade.